Norwest Case Study: New Storage Terminal & Pipeline Tie-in

Featured Project

NEW STORAGE TERMINAL & PIPELINE TIE-IN

The engineering team at Norwest provided project management, detailed engineering and design services necessary to complete a proper installation of our Client's crude oil storage & pump station. In addition to maintaining the level of safety standards and practices for our client, all services were within accordance with all accepted professional engineering regulations, standards, and practices.

Industry:

Oil & Gas: Storage terminal, dock, truck & pipelines

Location:

Ingleside, Texas

Industry:

Sweet, light crude

Project Duration:

2014 - 2017

Total Installed Cost:

$ 90,000,000

THE CHALLENGE

OUR SOLUTION

Full Site Map

Drainage analysis and report, drainage and grading plan

Structural design & drawings for pump foundations, office building, electrical building, LACT Skid foundations, pipe & cable supports, and platforms

VRU detailed design

Fiber-optic routing specifications

Mechanical design and drawings for equipment specifications, piping elevation drawings, isometric drawings and tank nozzle layout

Developed major equipment specifications for procurement and bid evaluations

Electrical design and drawings for cable, conduit & tray routing plans and sections

RESULTS

2.1 Million Barrel Greenfield Terminal Installation

Pipeline Tie-in

Seven (7) Marine Loading Arms

Pier Extension with New Mooring Points

Twelve (12) Loading Pumps

Six (6) 350,000 Barrel API-650 Storage Tanks

Five (5) Metering Skids

Multi-level Ship Access Structure

Design & Installation of SIS (Safety Instrumentation System)

Marine Vapor Combustor System

Want to see what we can do for you?

Presented by

Gold Symbol

Norwest Media Team

For business inquiries:
Norwest Engineering, Inc.
A: 4110 NE 122nd Ave., Suite 207, Portland, Oregon
P: (503) 254-0110
E: Info@norwestengineering.com

Comments are closed.